The Plan For Rose Quarter

From Sunday, August 21, to Saturday, September 3, we’re making improvements near the Rose Quarter to improve MAX reliability and make for a smoother ride.

Much like the work we completed along 1st Avenue in May, we’ll be replacing switches and improving the tracks just east of the Rose Quarter MAX Station. Switches in this area are 30 years old, so crews will replace the wooden ties (which were standard back in 1985) underneath the switches with a concrete track structure and much more durable and robust materials.

We’ll also realign the section of track that runs westbound into the Rose Quarter MAX Station. We’ll begin by removing the rails and that run into the old Trolley Barn. Then, we’ll smooth out the curve into the north platform, which will create a smoother ride into the station. This new design will help eliminate some long-term maintenance challenges and reduce wear and tear on the tracks. As part of the realignment, crews will adjust the overhead wire and relocate two existing poles.

We’ll also be updating the antiquated MAX signal system in the Rose Quarter area. Signal technology has improved dramatically since these were installed back in 1986. This will be the first time in MAX’s history that we’re upgrading the original signals — it’s kind of like rewiring part of your house. We’re most excited for this upgrade because it will decrease the chances of a signal malfunction, which causes train delays.

All of these much-needed renovations are to improve MAX reliability and keep trains running on time, but this work will disrupt regular MAX service for two weeks as we’ll have to shut down service along Holladay Street between the Rose Quarter and the Lloyd Center/NE 11th Ave MAX Station.

We know this two-week disruption will be a hassle, but it’s all for a good cause — to create a better and smoother ride for you.

Learn more about this MAX disruption and how your trips will be affected

Sarah Touey

Sarah Touey

I’m the resident engineer for TriMet’s Maintenance of Way projects. I seek out adventure by traveling and exploring other transit systems across the country, spending time at the beach with family and friends, and continuously remodeling our house with my husband Jarrett.

More Posts